PT-2026-116910 · Linux · Linux
CVE-2026-98691
·
تاريخ النشر
2026-10-18
·
تاريخ التحديث
2026-10-18
لا يوجد
لا تتوفر حاليًا تقييمات أو مقاييس للخطورة. سنحدّث المعلومات المقابلة في الصفحة فور توفرها.
In the Linux kernel, the following vulnerability has been resolved:
thunderbolt: Tear down inactive DP tunnels when the domain is stopped
tb stop() only tears down DMA tunnels so a DP tunnel that is still
waiting for dprx work to complete keeps that work queued while the
routers are removed and the control channel is stopped. The work only
stops once the DPRX timeout has passed and because it requeues itself
until then the flush workqueue() in tb domain remove() won't wait for its
final run. The callback then runs against a domain that is already torn
down. A reference to that domain is kept so the completion waiting for
that domain to disappear in unbind will block until the timeout is
eventually reached.
Tear down DP tunnels that are not active yet as well which also cancels
that work. Tunnels for displays that are already alive are untouched and
keep working.
وجدت خطأً في الوصف؟ لديك ما تضيفه؟ لا تتردد في مراسلتنا 👾
المعرّفات ذات الصلة
المنتجات المتأثرة
Linux